咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Evaluation of earthquake impac... 收藏

Evaluation of earthquake impact on magnitude of the minimum principal stress along a shotcrete lined pressure tunnel in Nepal

Evaluation of earthquake impact on magnitude of the minimum principal stress along a shotcrete lined pressure tunnel in Nepal

作     者:Krishna Kanta Panthi Chhatra Bahadur Basnet 

作者机构:Department of Ceoscience and PetroleumNorwegian University of Science and Technology 

出 版 物:《Journal of Rock Mechanics and Geotechnical Engineering》 (岩石力学与岩土工程学报(英文版))

年 卷 期:2019年第11卷第5期

页      面:920-934页

核心收录:

学科分类:08[工学] 0818[工学-地质资源与地质工程] 0815[工学-水利工程] 0813[工学-建筑学] 0814[工学-土木工程] 

主  题:Shotcrete lined pressure tunnel The minimum principal stress Three-dimensional(3D)numerical model Geology Tectonic activity Himalaya 

摘      要:In situ stress condition in rock mass is influenced by both tectonic activity and geological environment such as faulting and shearing in the rock mass.This influence is of significance in the Himalayan region,where the tectonic movement is active,resulting in periodic dynamic earthquakes.Each large-scale earthquake causes both accumulation and sudden release of strain energy,instigating changes in the in situ stress environment in the rock mass.This paper first highlights the importance of the magnitude of the minimum principal stress in the design of unlined or shotcrete lined pressure tunnel as water conveyance system used for hydropower schemes.Then we evaluated the influence of local shear faults on the magnitude of the minimum principal stress along the shotcrete lined high pressure tunnel of Upper Tamakoshi Hydroelectric Project(UTHP)in Nepal.A detailed assessment of the in situ stress state is carried out using both measured data and three-dimensional(3D)numerical analyses with FLAC3D.Finally,analysis is carried out on the possible changes in the magnitude of the minimum principal stress in the rock mass caused by seismic movement(dynamic loading).A permanent change in the stress state at and nearby the area of shear zones along the tunnel alignment is found to be an eminent process.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分