咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Partial Availability and RGBI ... 收藏

Partial Availability and RGBI Methods to Improve System Performance in Different Interval of Time: The Drill Facility System Case Study

Partial Availability and RGBI Methods to Improve System Performance in Different Interval of Time: The Drill Facility System Case Study

作     者:Eduardo Calixto Gilson Brito de Lima Alves Gilson Adelci Menezes de Oliveira 

作者机构:UFRJ-COPPE Rio de Janeiro Brazil UFF-LATEC Rio de Janeiro Brazil Petrobras S.A. Rio Grande do Norte Brazil 

出 版 物:《Open Journal of Modelling and Simulation》 (建模与仿真(英文))

年 卷 期:2014年第2卷第4期

页      面:144-153页

学科分类:1002[医学-临床医学] 100214[医学-肿瘤学] 10[医学] 

主  题:Partial Operational Availability System Age Probability Density Function (PDF) Reliability Growth Based Inspection (RGBI) 

摘      要:The main objective of this study is to propose a methodology to define the operational availability for a system in different interval of time based on Monte Carlo simulation. In addition, it is also an objective to identify critical equipment in such interval of time and define when carrying out inspections to detect and prevent failures. Nowadays, many software packages which apply Monte Carlo simulation based on reliability diagram block do not show the operational availability defined by interval of time. In most of cases, there’s no result that shows how system performs in specific interval of time. Depending on situation, it’s important to define the operational availability by different interval of time in order to follow up system performance along time. In order to solve such problem, it is proposed the “partial availability methodology based on system age. Indeed, such method regards equipment age based in different period of time that will results in Partial Availability. That means, as instance, in case of two years of simulation there will be the cumulative operational availability and partial operational availability results for first and second years for example. Therefore, it is also important to define the inspection time in each interval of time (year) in order to detect possible equipment failure and define preventive maintenance to avoid such failures that will be performed by RGBI method. In order to show such methodologies, it will be carried out a drill facility case study which is required to define operational availability of the system on the first and second years as well as inspection time.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分