咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >To compute or not to compute? 收藏

To compute or not to compute?

To compute or not to compute?

作     者:Alessandra Fiore Ivo Vanzi Camillo Nuti Cristoforo Demartino Rita Greco Bruno Briseghella 

作者机构:Department of Engineering and Geology University of Chieti-Pescara "G.d'Annunzio" DICAR Department of Civil Engineering and Architecture Polytechnic University of Bari College of Civil Engineering Fuzhou University Department of Architecture Roma Tre University College of Civil Engineering Nanjing Tech University DICATECH Department of Civil Engineering Environment Territory Building and Chemical Polytechnic University of Bari 

出 版 物:《Journal of Traffic and Transportation Engineering(English Edition)》 (交通运输工程学报(英文版))

年 卷 期:2019年第6卷第1期

页      面:85-93页

核心收录:

学科分类:081405[工学-防灾减灾工程及防护工程] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 08[工学] 0813[工学-建筑学] 0814[工学-土木工程] 0823[工学-交通运输工程] 

基  金:the research project "OptArch-689983 H2020-MSCA-RISE-2015/H2020-MSCA-RISE-20" 

主  题:Seismic retrofitting Structural reliability Safety Optimization Cost minimization 

摘      要:In a previous paper to retrofit or not to retrofit?(Nuti and Vanzi, 2003) a straightforward procedure able to forecast the economic return of seismic structural upgrading was presented. More recently, the authors realized that the final mathematical results can be much simplified so as to allow back-of-an-envelope computation. The title of this paper tries to highlight precisely this aspect, namely that for many a regular seismic structural upgrading cases, nearly no computation is needed(apart from one subtraction and one multiplication) to assess their economic convenience. These findings are presented and discussed in this paper, together with a state of the art on the cost-studies available in literature and technical codes. The mathematical formulation leading to the proposed approximation is suitably explained, underlining its applicability field and comparing it with the rigorous solution. Also a table and a formula are furnished that alternatively allows to calculate the maximum estimation errors, in order to obtain an upper and lower bound for the maximum amount of money which should be allocated for seismic structural upgrading.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分