咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Research on Duration Estimatio... 收藏
Research on Duration Estimation of Ling Shan Tunnel Engineer...

Research on Duration Estimation of Ling Shan Tunnel Engineering

作     者:Yuexiao Gao Wenjuan Zhao 

作者单位:Postgraduate Management science and Engineering Xi'an University of Architecture and Technology 

会议名称:《2011 International Conference on Computer Science and Information Technology(ICCSIT 2011)》

会议日期:2011年

学科分类:12[管理学] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 

关 键 词:Tunnel Information Diffusion Theory Duration 

摘      要:The South-to-North Water Diversion is a tough and groundbreaking project of a province. Ling Shan tunnel is a key engineering which has many uncertain factors and complex problems in construction. In order to implement the project smoothly, is worth to research how to establish a scientific and reasonable construction schedule. The paper is based on the data of five similar tunnel engineerings, applying information diffusion theory to the construction progress network diagram so as to estimate main work time and determine the key circuit. Therefore, the project managers can calculate the total duration of Ling Shan tunnel engineering more accurately and offer reliable evidence for the follow-up engineerings.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分