Scheduling Method for Tire Building Based on Heuristic Algorithm
作者单位:Key Laboratory of Process Industry Automation of Ministry of Education Northeastern University Mesnac Co. Ltd National Tire Technology and Control Engineering Technology Research Center
会议名称:《第25届中国控制与决策会议》
主办单位:IEEE;NE Univ;IEEE Ind Elect Chapter;IEEE Harbin Sect Control Syst Soc Chapter;Guizhou Univ;IEEE Control Syst Soc;Syst Engn Soc China;Chinese Assoc Artificial Intelligence;Chinese Assoc Automat;Tech Comm Control Theory;Chinese Assoc Aeronaut;Automat Control Soc;Chinese Assoc Syst Simulat;Simulat Methods & Modeling Soc;Intelligent Control & Management Soc
会议日期:2013年
学科分类:08[工学] 0805[工学-材料科学与工程(可授工学、理学学位)] 080502[工学-材料学]
基 金:supported by the Chinese National Fundamental Research Program under Grant 2009CB320601 the National Natural Science Foundation of China under Grant 61104174 and 61174187
关 键 词:Tire Building Scheduling Heuristic Algorithm
摘 要:There are more product specifications, great production and much equipment over the whole process of tire building. The actual complex scheduling problem of tire building is described in detail. To solve the complex multi-objective, large-scale production scheduling problem of tire building, a heuristic algorithm is proposed from the experience of the experts. The algorithm was tested by online data. Results show that the heuristic algorithm can quickly workout the optimal production scheduling of tire building, reduce the production cost, and improve productivity. The algorithm will lay the firm groundwork for application to production process in the future.