咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >SCGM(1,m)_c model with time-la... 收藏

SCGM(1,m)_c model with time-lag and its application in deformation analysis

SCGM(1,m)_c model with time-lag and its application in deformation analysis

作     者:LI Zhi wei 1, LI Tao 1,ZHU Jian jun 1,WANG Ren qian 2 (1.College of Resources, Environment and Civil Engineering, Central South University, Changsha 410083, China 2.Department of Civil Engineering, Huaqiao University, Quanzhou 350029, China) 

作者机构:College of Resources Environment and Civil Engineering Central South University Changsha China Department of Civil Engineering Huaqiao University Quanzhou China 

出 版 物:《Journal of Central South University of Technology》 (中南工业大学学报(英文版))

年 卷 期:2001年第8卷第1期

页      面:40-44页

核心收录:

学科分类:083001[工学-环境科学] 0830[工学-环境科学与工程(可授工学、理学、农学学位)] 08[工学] 

基  金:TheNationalNaturalScienceFoundationofChina! (No .497742 0 9) 

主  题:grey system SCGM(1,m)c time-lag deformation analysis 

摘      要:Originated in the early 1990s, SCGM(1, m ) c model has enjoyed widespread application in the fields of urban planning, society economy prediction and modal control in recent years. However, none of these applications have taken account of time lag effects in the modeling process. Aiming at overcoming the defect, the authors introduced time lag items into SCGM(1, m ) c model and developed a SCGM(1, m ) c model with time lag, then discusses in detail some principal problems in the model, such as parameters estimation, model verifying, model prediction, etc. The model was used on a real slope monitoring project and compared with the conventional SCGM(1, m ) c model. The results show an improvement of average models precision from 1.321 to 0.238 and total average of relative prediction errors from 12.41% to 7.98% when the modeling data length ranges from 29 to 48 in the slope monitoring case.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分