咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Reaction kinetics during direc... 收藏

Reaction kinetics during direct alloying of manganese ore cored wire

作     者:Wei Wu Qi Gao Bo Zhang Hua-dong Meng Lu Lin Jia-qing Zeng Wei Wu;Qi Gao;Bo Zhang;Hua-dong Meng;Lu Lin;Jia-qing Zeng

作者机构:Metallurgical Technology Research DepartmentCentral Iron and Steel Research InstituteBeijing 100081China State Key Laboratory of Refractory and MetallurgyWuhan University of Science and TechnologyWuhan 430081HubeiChina 

出 版 物:《Journal of Iron and Steel Research(International)》 (钢铁研究学报(英文版))

年 卷 期:2020年第27卷第3期

页      面:282-294页

核心收录:

学科分类:08[工学] 0806[工学-冶金工程] 0805[工学-材料科学与工程(可授工学、理学学位)] 080502[工学-材料学] 0703[理学-化学] 0801[工学-力学(可授工学、理学学位)] 0702[理学-物理学] 

基  金:This research has been financially supported by the National Key R&D Program(2017YFB0304000) the Beijing Natural Science Foundation(2172057)in China the State Key Laboratory of Refractories and Metallurgy Foundation(G201804) the National Natural Science Foundation of China(51704080,51874102). 

主  题:Manganese ore Cored wire Direct alloying process Reaction kinetics Mass transfer rate 

摘      要:In order to increase the reaction rates between the molten steel and the slag and cut down the reduction time when the top slag of manganese ore is added into the molten steel,a method of directly alloying manganese ore has been experimented in a 500-kg induction furnace.The results show that the manganese yield is greater than 90%when the wire feeding method is used.The manganese yield is 43.26%within 1 min.In contrast,the manganese yield for the top-slag adding process is only 10.98%for the same duration.The mass transfer rate of the manganese is greater in the molten steel than in the slag,and the limiting factor is the mass transfer rate of the manganese in the slag in the period of 10-30 min.The slag composition area is closer to the area of high melting point for the wire feeding method than for the top-slag adding process.During the slagging process,refining slag composed of C a O and SiO:is formed after 15 min;after 25-30 min,refining slag with a high basicity is formed and consists of CaO,SiO2 and Al203.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分