咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Monitoring and Evaluating the ... 收藏

Monitoring and Evaluating the Sedimentation Process in Mosul Dam Reservoir Using Trap Efficiency Approaches

Monitoring and Evaluating the Sedimentation Process in Mosul Dam Reservoir Using Trap Efficiency Approaches

作     者:Issa E. Issa Nadhir Al-Ansari Sven Knutsson Govand Sherwany 

作者机构:Department of Civil Environmental and Natural Resources Engineering Luleå University of Technology Luleå Sweden University of Mosul Mosul Iraq Ministry of Higher Education and Scientific Research—KRG Erbil Iraq 

出 版 物:《Engineering(科研)》 (工程(英文)(1947-3931))

年 卷 期:2015年第7卷第4期

页      面:190-202页

学科分类:1002[医学-临床医学] 100214[医学-肿瘤学] 10[医学] 

主  题:Losing Storage Capacity Mosul Dam Reservoir Sedimentation Sediment Trap Efficiency 

摘      要:Reservoirs are usually exposed to sediment accumulation problems that will lead to reduction in their storage capacity. This problem directly affects the performance of the dams and causes shortage of their useful life. The simplest technique to estimate sediment deposition rate is using sediment rating curve with sediment trapping efficiency (TE) of the reservoir. Many empirical and semi-empirical approaches have been suggested for to determine this term depending on the annual inflow rate, reservoir characteristics and features of the catchments area. In this study six different empirical methods depending on the residence time principle (water retention time) were used. These approaches were reviewed and applied to determine TE of Mosul dam reservoir (MDR) for period 1986 to 2011. The monthly operating data for inflow, outflow and water elevations for MDR were used to determine monthly TE and long-term TE for whole period of MDR using the mentioned methods. Furthermore, the monthly inflow rate for River Tigris upstream MDR, its sediment rating curve and sediment feeding from valleys around MDR were used to estimate the amount sediment coming to the reservoir. The results provided by these methods for TE with sediment coming to MDR were used to compute the amount of sediment deposited in MDR on monthly bases during this period. The results obtained were evaluated using observed bathymetric survey data that had been collected in 2011 after 25 years of the operation of the dam. The results showed all the mentioned methods gave convergent results and they were very close to bathymetric survey results for estimating the volume of sediment deposited especially that proposed by Ward which gave 0.368% percentage error. Furthermore, the result computed using monthly TE gave good agreement if compared with that long-term TE where the percentage error was ranging between –3.229% to 1.674% for monthly adopted data and –4.862% to?–2.477% for whole period data. It is believed

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分