咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Application of polyurethane ge... 收藏

Application of polyurethane geocomposites to help maintain track geometry for high-speed ballasted railway tracks

Application of polyurethane geocomposites to help maintain track geometry for high-speed ballasted railway tracks

作     者:Peter Keith WOODWARD Abdellah EL KACIMI Omar LAGHROUCHE Gabriela MEDERO Meysam BANIMAHD 

作者机构:Institute for Infrastructure and EnvironmentSchool of the Built EnvironmentHeriot-Watt UniversityEdinburghEH14 4ASUK 

出 版 物:《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 (浙江大学学报(英文版)A辑(应用物理与工程))

年 卷 期:2012年第13卷第11期

页      面:836-849页

核心收录:

学科分类:08[工学] 0814[工学-土木工程] 082301[工学-道路与铁道工程] 0823[工学-交通运输工程] 

基  金:Project (No. EP/H027262/1) partially supported by the Engineering and Physical Sciences Research Council UK 

主  题:Railways Polyurethanes Geocomposites Modelling High-speed 

摘      要:There are many issues surrounding the performance of critical assets on high-speed ballasted railway *** assets like switch & crossings and bridge transitions high track forces can be produced resulting in higher ballast settlements and hence track *** latter result in higher track forces and hence more settlement,leading to the need for increased track maintenance to ensure comfort and *** technologies for solving issues like ballast movement under high-speed loading regimes are ***,a technique that has been well used across the UK and now increasingly overseas to stabilise and reinforce ballasted railway tracks is the application of in-situ polyurethane polymers,termed *** paper discusses how this technique can be used to solve these types of long-standing issues and presents actual polymer application profiles at two typical critical sites,namely a junction and a transition onto concrete slab-track.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分