咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Condensate Polishing System fo... 收藏

Condensate Polishing System for PWR Nuclear Power Plant

Condensate Polishing System for PWR Nuclear Power Plant

作     者:A.L. Wang C.Y. Zhang Y.Q. Yang L.L. Yin 

作者机构:Shandong Electric Power Engineering Consulting Institute Co. Ltd. Jinan Shandong 250013 China Jinan Power Electrical Facility Co. Ltd. Jinan Shandong 250013 China State Nuclear Electric Power Planning Design & Research Institute Beijing 100094 China 

出 版 物:《Journal of Energy and Power Engineering》 (能源与动力工程(美国大卫英文))

年 卷 期:2011年第5卷第10期

页      面:999-1004页

学科分类:080802[工学-电力系统及其自动化] 0808[工学-电气工程] 0817[工学-化学工程与技术] 08[工学] 

主  题:Condensate polishing system water quality operation. 

摘      要:In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give conclusion about condensate polishing system configuration and operation requirement: full flow condensate polishing system (CPS) is necessary to the units cooled by sea water, and it is better that one or two series put in service during normal operation other than all of them in hot standby. While continuous condensate tube leakage is 256 L/h, the units cooled by fresh water will be shutdown immediately, for this level leakage, whichever condensate polishing system capacity is 50% (30%) or 100%, action level 2 will be preformed, so 50% (30%) is enough for fresh water cooled units.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分