Change of joint aperture during formation of ice-ring around underground LNG storage cavern
作者单位:Geologic Environment DivisionKorea Institute of Geoscience and Mineral ResourcesDaejeonKorea
会议名称:《Harmonising Rock Engineering and the Environment—12th ISRM International Congress on Rock Mechanics》
会议日期:2011年
学科分类:08[工学] 080104[工学-工程力学] 0815[工学-水利工程] 0801[工学-力学(可授工学、理学学位)]
关 键 词:fluid flow ground freezing rock joints cryosuction
摘 要:正In general,either above-ground tanks or in-ground tanks been used worldwide to store *** types of tanks have a number of problems such as the need for a large site for storage tanks,ground settlement,high operating costs,an excessive boil-off ratio due to radiant heat from the sun,and so *** attempts have therefore been made in the past to store LNG underground in unlined containment,though without success. The new system for storing LNG in rock caverns had been developed and verified through the design,construction and operation of a LNG pilot plant in Daejeon,***