Annual Report on SPR Operation in 2009

Annual Report on SPR Operation in 2009

作     者:NIU Sheng-li 

会议日期:2010年

学科分类:07[理学] 070203[理学-原子与分子物理] 0702[理学-物理学] 

摘      要:1 Information of operation Operation person:present chief operators are 9 persons,operators are 8 persons;new chief operators are 2 persons,new operator is 0 person;training chief operators are 3 persons,training operators are 2 persons;transferred chief operator is 1 person;transferred operator is 0 *** data:times of operation are 8;times of unplanned shutdown are 3;operation duration is 1 928.22 h;the released energy is 281.19 MWd;the rated power is 3.5 *** loop water:pH=5.9,conductance is 7.15×l0Ω·cm;pool for maintaining:pH=5.9,the conductance is 7.15×l0 *** waste:Ar,2.388×10 m,