文献详情 >Deformation Control of the 200... 收藏
Deformation Control of the 200 m High Hongjiadu Concrete Fac...

Deformation Control of the 200 m High Hongjiadu Concrete Faced Rockfill Dam

作     者:Yang Zeyan~1 Jiang Guocheng~2 1.Hydrochina Corporation 2.China Institute of Water Resources and Hydropower Research Beijing 100014 China 

会议名称:《第一届堆石坝国际研讨会》

会议日期:2009年

学科分类:081504[工学-水利水电工程] 08[工学] 0815[工学-水利工程] 

关 键 词:Hongjiadu Hydropower Station high concrete faced rockfill dam deformation control technology 

摘      要:正Focus on the problems of CFRD with dam height around 200 m,combining with the characteristics of Hongjiadu project,the study on deformation properties and deformation control technology of high CFRD has been carried *** paper discussed deformation properties of 200 m high CFRD,with deformation control conducted in terms of the selection of materials,dam body zoning and filling construction,proposed the quantitative index of rockfill pre-settlement and integrated technology of deformation control on improvement of rockfill compaction,reshaping of steep slope inside the dam,setting high modulus zone and overall balanced rise of construction *** measures was applied in Hongjiadu CFRD and achieved good effects of dam deformation control,no structural cracks on face slab and the leakage is small.