The Earliness/Tardiness Production Planning for Fuzzy Lot Size Manufacturing Systems
会议名称:《The Fifth International Conference on Information and Management Sciences》
会议日期:2006年
学科分类:12[管理学] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 081104[工学-模式识别与智能系统] 08[工学] 0835[工学-软件工程] 0811[工学-控制科学与工程] 0812[工学-计算机科学与技术(可授工学、理学学位)]
关 键 词:production planning fuzzy programming genetic algorithm
摘 要:正In this paper, the earliness/tardiness production planning with fuzzy consumer demands and capacity is described and three types of fuzzy programming models are formulated. For solving these fuzzy models, fuzzy simulation and genetic algorithm are integrated to produce a hybrid intelligent algorithm. Finally, a numerical example is discussed.