咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >The Earliness/Tardiness Produc... 收藏
The Earliness/Tardiness Production Planning for Fuzzy Lot Si...

The Earliness/Tardiness Production Planning for Fuzzy Lot Size Manufacturing Systems

作     者:Na Sun Department of Mathematical Sciences Tsinghua University Beijing 100084 China 

会议名称:《The Fifth International Conference on Information and Management Sciences》

会议日期:2006年

学科分类:12[管理学] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 081104[工学-模式识别与智能系统] 08[工学] 0835[工学-软件工程] 0811[工学-控制科学与工程] 0812[工学-计算机科学与技术(可授工学、理学学位)] 

关 键 词:production planning fuzzy programming genetic algorithm 

摘      要:正In this paper, the earliness/tardiness production planning with fuzzy consumer demands and capacity is described and three types of fuzzy programming models are formulated. For solving these fuzzy models, fuzzy simulation and genetic algorithm are integrated to produce a hybrid intelligent algorithm. Finally, a numerical example is discussed.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分