New Technique Applied and Attained Design Production in Baosteel No.4 BF
会议名称:《技术创新与循环经济——第二届宝钢学术年会》
会议日期:2006年
学科分类:080602[工学-钢铁冶金] 08[工学] 0806[工学-冶金工程]
关 键 词:blast furnace technology equipment blow in index
摘 要:正Baosteel No.4 BF is one of the important programs of Baosteel 10th five years *** of building,No.4 BF is located to be a modem BF that owns first class techniques and leading technologies. Under the direction of the thought,Iron - making plant has traced and analyzed the international technical development trend of large size BF,summarized the self - innovate technical results and successful experiments. On the base of it,Iron - making plant has decided the layout;concentrated a series of new technologies,new processes and new equipments to No.4 BF to realize energy saving,environmental protection,long -life and high *** 26 months building,No.4 BF has been blown in,and rapidly realized designed production and first class index,which puts Baosteel iron - making technology to upper step.