咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Dynamic risk management practi... 收藏
Dynamic risk management practice of construction for the lon...

Dynamic risk management practice of construction for the long-distance and largest-diameter tunnel

作     者:Z.H.Huang,X.L.Peng & W.Fang Shanghai Changjiang River Tunnel & Bridge Construction Company,Shanghai,P.R.China 

会议日期:2008年

学科分类:12[管理学] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 

关 键 词:Tunnel Dynamic risk management practice of construction for the long-distance and largest-diameter tunnel 

摘      要:This paper describes the construction of Shanghai Yangtze River Tunnel with its background, and discusses the difficulties of construction management of long-distance and large-diameter *** risk management is introduced to the tunnel construction management,to eliminate or reduce the relative risk resources,by risk analysis and *** aims to track the risk continuously,adopt various management methods consisting of monitoring and management of TBM,the-third-party monitoring,shift management, construction consultants,construction monitoring by telecommunication,rule construction in *** the construction of long-distance and large-diameter tunnel as example,it tells how to predicate and control risks by using dynamic risk management is introduced.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分