Application of Case-Based Reasoning in cost estimation of drilling wells
作者单位:Industrial Engineering DepartmentCollege of EngineeringUniversity of TehranTehranIran Petropars CompanySouth Pars Phase 12Assistant Professor of IIESTehranIran
会议名称:《2012 International Conference on Industrial and Intelligent Information(ICIII 2012)》
会议日期:2012年
学科分类:0820[工学-石油与天然气工程] 082001[工学-油气井工程] 08[工学]
关 键 词:Case Based Reasoning (CBR) Cost Estimation
摘 要:Costs estimation of drilling for new wells is one of the main concerns of active companies in this *** some of features of drilling can not be expressed quantitatively and there are many qualitative features in data of the available *** a method should be applied to use these data to estimate the desired and ideal output of project *** case based reasoning (CBR) method covers the qualitative data with regard to its *** CBR method which is created based on the viewpoint of using presented solutions for previous solved problems in order to solve new similar problem save time and therefore speed of drilling is increased which it is very important,as regards available estimation methods spend the much time to estimate output which is cost of drilling wells in this case *** results show that obtained estimation accuracy is high.