DESIGN FEATURE AND PRELIMINARY RESULTS OF COMMISSIONING TEST OF THE PFBC BOILER OF THE 15MWe PILOT PFBC-CC UNIT IN CHINA
会议名称:《CSPE-JSME-ASME International Conference on Power Engineering》
会议日期:2001年
学科分类:080703[工学-动力机械及工程] 08[工学] 0807[工学-动力工程及工程热物理]
关 键 词:Fluidized Bed Pressurized Fluidized Bed Combustion Coal Boiler
摘 要:正In the mid of 1998, the first 15MWe pilot PFBC-CC unit in China was established in Jiawang power *** on two years‘commission and modification,at present,the unit basically operates *** introduction of the pressurized fluidized bed boiler in Jiawang is given including main design parameters,general arrangement of the boiler,boiler load turndown method,structural shape of the main heat transfer surfaces,*** to now,the unit has already passed the 72-hour continuous operation test and accumulatively operated formore than 900 hours. The commissioning test results are reported in detail including the temperature Profile in *** carbon content in the bottom ash and fly ash. coal combustion efficiency,desulfurizationefficiency and boiler load turndown *** those works build a database for the design and operation of thePFBC boiler.