A Flood Reduction Master Plan Study in Canada
作者单位:Canadian Society for Civil Engineering
会议名称:《民生水利——理念与行动:中国水利学会2010学术年会》
会议日期:2010年
学科分类:081504[工学-水利水电工程] 08[工学] 0815[工学-水利工程]
关 键 词:Flood Reduction Master Plan Watershed Management Environmental Assessment
摘 要:正In July of 2004,a city with population about 116,000 in south Ontario experienced severe flooding,which caused a flood damages in excess of$100 million in direct physical damages to private and public property.A flood reduction master plan study was conducted in order to achieve higher level of protection over the long *** study is designed to address two types of flooding situations which have occurred in the past or may occur in the *** framework of a Municipal Class Environmental Assessment was applied during the *** is appropriate not only because it provides a basis for approvals for any specific recommended projects but also because it addresses the problem in a multi - objective,ecosystem based *** provides opportunities to not only avoid potential environmental impacts but to develop projects which integrate environmental restoration and *** could include the use ofnatural channel designwhere channel improvements are recommended,the provision of fish passage where culvert improvements/ enlargements are required and use of artificial wetlands to provide runoff *** paper described a procedure to do the flood reduction master plan in Canada.