咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >The Development and Research o... 收藏

The Development and Research on the Coordinate Control Strategy Between Turbine and Boiler in Fossil Power Plant

The Development and Research on the Coordinate Control Strategy Between Turbine and Boiler in Fossil Power Plant

作     者:WEI Shuangying (Management School,Wuhan University of Technology,Wuhan 430070,China) 

作者机构:Management SchoolWuhan University of TechnologyWuhan 430070China 

出 版 物:《武汉理工大学学报》 (Journal of Wuhan University of Technology)

年 卷 期:2006年第28卷第S1期

页      面:363-366页

学科分类:080702[工学-热能工程] 08[工学] 0807[工学-动力工程及工程热物理] 

主  题:fossil power plant coordinate control system between turbine and boiler development and research 

摘      要:Based on the research on domestic and international automatic technical development in fossil power plant,the paper analyses the recent situation of the coordinate control system between turbine and boiler of domestic fossil Power Plant,provides the development thought of coordinate control system between turbine and boiler,and describes the application prospect in control system of fossil power plant combining with the application experience.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分