咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Identifying stakeholders’roles... 收藏

Identifying stakeholders’roles and relevant project documents for 4D-based collaborative decision making

作     者:Veronika BOLSHAKOVA Annie GUERRIERO Gilles HALIN Veronika BOLSHAKOVA;Annie GUERRIERO;Gilles HALIN

作者机构:MRn°3495 MAP-CRAI Mixed Research Unit Modelsand Simula tions for Architecture and Heritage-Research Centre in Architecture and EngineeringNancy 54000France CNRS-The National Centre for Scientific ResearchParis 75794France LIST-Luxembourg Institute of Science and TechnologyEsch-sur-Alzette L-4362Luxemburg University of LorraineNancy 54000France 

出 版 物:《Frontiers of Engineering Management》 (工程管理前沿(英文版))

年 卷 期:2020年第7卷第1期

页      面:104-118页

学科分类:12[管理学] 0711[理学-系统科学] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 07[理学] 071101[理学-系统理论] 

基  金:National Research Agency (France) [ANR-16-CE10-0006-02] Agence Nationale de la Recherche (ANR) [ANR-16-CE10-0006] Funding Source: Agence Nationale de la Recherche (ANR) 

主  题:BIM 4D BIM 4D BIM use AEC project management collaboration decision making 

摘      要:To fully understand and effectively implement 4D building information modelling(BIM)models and methods,we need to develop a precise knowledge of which project digital documents should be used and how they influence the decision-making(DM)*** article studies the convergence between uses of 4D BIM and digital project *** hypothesize that a clear visualization of the construction simulation through a 4D model is a useful source of information and a support for DM at collaborative *** this research,we continue to progress toward a new 4D-based collective decision device,so these elements will contribute to propose 4D BIM as DM support on architecture engineering construction(AEC)***,the present research will be complemented by results from questionnaires given at a later research *** article presents a brief review of BIM context to consider ways of fostering the implementation of all 4D BIM uses(not only visualization).It then introduces a proposition for 4D BIM uses implementation by the project development *** concludes by summarizing stakeholders’roles and documents relevant to 4D BIM uses.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分