咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Two-Agent Scheduling on a Boun... 收藏

Two-Agent Scheduling on a Bounded Parallel-Batching Machine with Makespan and Maximum Lateness Objectives

与 Makespan 和最大的迟到目的在一台围住的平行批的机器上的二代理人的安排

作     者:Qi Feng Wei-Ping Shang Cheng-Wen Jiao Wen-Jie Li 

作者机构:College of ScienceZhongyuan University of TechnologyZhengzhou 450007China School of Mathematics and StatisticsZhengzhou UniversityZhengzhou 450001China School of Mathematical SciencesLuoyang Normal UniversityLuoyang 471022China 

出 版 物:《Journal of the Operations Research Society of China》 (中国运筹学会会刊(英文))

年 卷 期:2020年第8卷第1期

页      面:189-196页

核心收录:

学科分类:07[理学] 0701[理学-数学] 070101[理学-基础数学] 

基  金:This research was supported in part by the National Natural Science Foundation of China(Nos.11401604,11571323,11701595,11501279) also supported by Program for Interdisciplinary Direction Team in Zhongyuan University of Technology,China 

主  题:Two-agent scheduling Parallel-batching Maximum lateness Pareto optimal points 

摘      要:This paper studies the two-agent scheduling on a bounded parallel-batching *** the problem,there are two agents A and B each having their own job sets with the restriction that the processing times of jobs of agent B are *** jobs of different agents can be processed in a common ***,each agent has its own objective function to be *** objective function of agent A is the makespan of its jobs,and the objective function of agent B is the maximum lateness of its *** present a polynomial-time algorithm for finding all Pareto optimal solutions of this two-agent parallel-batching scheduling problem.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分