Estimation of the Maximum Allowable Loading Amount of COD in Luoyuan Bay by a 3-D COD Transport and Transformation Model
Estimation of the Maximum Allowable Loading Amount of COD in Luoyuan Bay by a 3-D COD Transport and Transformation Model作者机构:Key Laboratory of Marine Chemistry Theory and Technology Ministry of Education Ocean University of China College of Chemistry and Chemical Engineering Ocean University of China College of Environmental Science and Engineering Ocean University of China
出 版 物:《Journal of Ocean University of China》 (中国海洋大学学报(英文版))
年 卷 期:2014年第13卷第4期
页 面:604-612页
核心收录:
学科分类:083002[工学-环境工程] 0830[工学-环境科学与工程(可授工学、理学、农学学位)] 07[理学] 08[工学] 09[农学] 0903[农学-农业资源与环境] 0713[理学-生态学]
基 金:supported by the Science Fund Projects of Shandong Province (ZR2010DM005) the State Ocean Administration of China ‘908’ Foundation (908-02-02-03) the Science and Technology Development Plan of Qingdao (11-2-3-66-nsh and 11-2-1-18-hy)
主 题:TPLC environmental capacity COD Luoyuan Bay linear programming model
摘 要:The rapid economic and social developments in the Luoyuan and Lianjiang counties of Fujian Province,China,raise certain environment and ecosystem *** unusual phytoplankton bloom and eutrophication,for example,have increased in severity in Luoyuan Bay (LB).The constant increase of nutrient loads has largely caused the environmental degradation in *** countermeasures have been implemented to solve these environmental *** most effective of these strategies is the reduction of pollutant loadings into the sea in accordance with total pollutant load control (TPLC) plans.A combined three-dimensional hydrodynamic transport-transformation model was constructed to estimate the marine environmental capacity of chemical oxygen demand (COD).The allowed maximum loadings for each discharge unit in LB were calculated with applicable simulation *** simulation results indicated that the environmental capacity of COD is approximately 11×l0^4tyear^-1 when the water quality complies with the marine functional zoning standards for LB.A pollutant reduction scheme to diminish the present levels of mariculture-and domestic-based COD loadings is based on the estimated marine COD environmental *** obtained values imply that the LB waters could comply with the targeted water quality *** meet the revised marine functional zoning standards,discharge loadings from discharge units 1 and 11 should be reduced to 996 and 3236t year^-1,respectively.