咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Capacity-based performance mea... 收藏

Capacity-based performance measurements for loading equipment in open pit mines

基于能力露天矿山装载设备的性能测量(英文)

作     者:Amin MONIRI-MORAD Mohammad POURGOL-MOHAMMAD Hamid AGHABABAEI Javad SATTARVAND 

作者机构:Department of Mining EngineeringSahand University of TechnologyTabriz 51335-1996Iran Department of Mechanical EngineeringSahand University of TechnologyTabriz 51335-1996Iran Department of Mining and Metallurgical EngineeringUniversity of NevadaReno 89557United States 

出 版 物:《Journal of Central South University》 (中南大学学报(英文版))

年 卷 期:2019年第26卷第6期

页      面:1672-1686页

核心收录:

学科分类:0810[工学-信息与通信工程] 081901[工学-采矿工程] 0819[工学-矿业工程] 0806[工学-冶金工程] 08[工学] 0805[工学-材料科学与工程(可授工学、理学学位)] 0703[理学-化学] 0812[工学-计算机科学与技术(可授工学、理学学位)] 

基  金:Authors would like to appreciate the support of the operation management and maintenance department at Sungun Copper Mine 

主  题:capacity performance maintainability mining equipment risk assessment 

摘      要:The purpose of this study is to develop an integrated framework for capacity analysis to address the influence of systematic hazardous factors on the haulage fleet nominal *** proposed model was made to capture unexpected risks for mining equipment based upon data-driven method considering different *** risk assessment(PRA)was employed to quantify the loss of production capacity by focusing on severity of failure incidents and maintainability ***-event simulation was configured to characterize the nominal capacity for mining ***,the system capacity was analyzed through the comparison of nominal and actual capacity.A case study was completed to validate the research *** past operation and maintenance field data were collected for shovel *** discrete-event simulation was developed to estimate the rate of shovel nominal ***,the effects of undesirable scenarios were assessed by developing the PRA *** research results provide significant insights into how to enhance the production capacity in *** analyst gets a well judgment for the crucial elements dealing with high risk levels.A holistic maintenance plan can be developed to mitigate and control the losses.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分