Subsea Maintenance Service Delivery:Mapping Factors Influencing Scheduled Service Duration

Subsea Maintenance Service Delivery:Mapping Factors Influencing Scheduled Service Duration

作     者:Efosa Emmanue Tore Markeset 

作者机构:Faculty of Science and TechnologyDepartment of Operations and MaintenanceUniversity of Stavanger Shell Petroleum Development Company 

出 版 物:《International Journal of Automation and computing》 (国际自动化与计算杂志(英文版))

年 卷 期:2010年第7卷第2期

页      面:167-172页

核心收录:

学科分类:0820[工学-石油与天然气工程] 08[工学] 0802[工学-机械工程] 082002[工学-油气田开发工程] 0701[理学-数学] 0811[工学-控制科学与工程] 0812[工学-计算机科学与技术(可授工学、理学学位)] 

主  题:Oil and gas assets subsea inspection, maintenance, and repair (IMR) services service delivery influence factors scheduling. 

摘      要:The oil and gas (O&G) industry on the Norwegian continental shelf (NCS) leads the world in terms of the number of subsea O&G installations. Ensuring the dependability of these assets is critical. Non-intrusive inspection, maintenance and repair (IMR) services are therefore needed to reduce risks. These services are planned and executed using a mono-hull offshore vessel complete with remotely operated vehicles (ROVs), a module handling system and an active heave compensated crane. Vessel time is shared between competing jobs, using a prioritized forward-looking schedule. Extension in planned job duration may have an impact on O&G production, service costs and health, safety, and environmental (HSE) risks. This paper maps factors influencing the job schedule efficiency. The influence factors are identified through reviews of literature as well as interviews with experts in one of the large IMR subsea service providers active on the Norwegian Continental Shelf. The findings show that the most obvious factors are weather disruption and water depth. Other factors include job complexity, job uncertainty, IMR equipment availability, as well as the mix of job complexity.