Abutment pressure distribution for longwall face mining through abandoned roadways

Abutment pressure distribution for longwall face mining through abandoned roadways

作     者:Yang Li Mingxing Lei Haosen Wang Cheng Li Weiwei Li Yang Tao Jingyi Wang 

作者机构:College of Resources and Safety EngineeringChina University of Mining and Technology Beijing China National Machinery Imp&Exp.Corp 

出 版 物:《International Journal of Mining Science and Technology》 (矿业科学技术学报(英文版))

年 卷 期:2019年第29卷第1期

页      面:59-64页

核心收录:

学科分类:081901[工学-采矿工程] 0819[工学-矿业工程] 0709[理学-地质学] 0808[工学-电气工程] 08[工学] 0818[工学-地质资源与地质工程] 0708[理学-地球物理学] 0807[工学-动力工程及工程热物理] 0815[工学-水利工程] 0813[工学-建筑学] 0814[工学-土木工程] 

基  金:supported by National Key R&D Program of China (No. 2017YFC060300204) Yue Qi Young Scholar Project,CUMTB and Yue Qi Distinguished Scholar Project (No. 800015Z1138) China University of Mining & Technology, Beijing 

主  题:Abandoned roadways Abutment pressure Theoretical calculation Numerical simulation 

摘      要:Abutment pressure distribution is different when a longwall panel is passing through the abandoned gate roads in a damaged coal seam. According to the geological condition of panel E13103 in Cuijiazhai Coal Mine in China, theoretical analysis and finite element numerical simulation were used to determine the front pressure distribution characteristics when the longwall face is 70, 50, 30, 20, 10, and 5 m from the abandoned roadways. The research results show that the influence range of abutment pressure is 40 to 45 m outby the face, and the peak value of front abutment pressure is related to the distance between the face and abandoned roadways. When the distance between the longwall face and abandoned roadways is reduced from 50 to 10 m, the front abutment pressure peak value kept increasing. When the distance is 10 m, it has reached the maximum. The peak value is located in 5 to 6 m outby the faceline. When the distance between the longwall face and abandoned roadways is reduced from 10 to 5 m, the front abutment pressure sharply decreases, the intact coal yields and is even in plastic state. The peak value transfers to the other side of the abandoned roadways. The research results provide a theoretical basis for determining the advance support distance of two roadways in the panel and the reinforcement for face stability when the longwall face is passing through the abandoned roadways.