咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Selection method of risk respo... 收藏

Selection method of risk response schemes for mining project based on fuzzy preference relations

Selection method of risk response schemes for mining project based on fuzzy preference relations

作     者:SUN Bing LUO Hai-tao 

作者机构:School of Management Liaoning Technical University Fuxin 123000 China 

出 版 物:《Journal of Coal Science & Engineering(China)》 (煤炭学报(英文版))

年 卷 期:2010年第16卷第2期

页      面:221-224页

学科分类:12[管理学] 1201[管理学-管理科学与工程(可授管理学、工学学位)] 07[理学] 081104[工学-模式识别与智能系统] 08[工学] 070105[理学-运筹学与控制论] 0835[工学-软件工程] 0701[理学-数学] 0811[工学-控制科学与工程] 0812[工学-计算机科学与技术(可授工学、理学学位)] 

主  题:mining project risk response scheme fuzzy preference relation C-IOWA operator 

摘      要:To overcome the subjectivity of experts in the process of risk response scheme selection, according to the theory of group decision making, a selection method and flow of the risk response schemes for a mining project was proposed based on fuzzy preference relation and consistency induced ordered weighted averaging (C-IOWA) operator,which can overcome the loss of information in the process of group decision making to a great degree, and improve its efficiency and quality.A numeric example was introduced to illustrate the application of the method, also validating the method as scientific and practicable.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分