咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Reliability of paste fill syst... 收藏

Reliability of paste fill system of the Jinchuan No.2 mine

Reliability of paste fill system of the Jinchuan No.2 mine

作     者:Sijing Cai and Changjie ChenCivil and Environmental Engineering School, University of Science and Technology Beijing, Beijing 100083, China (Received 2001-10-24) 

作者机构:Civeil and Environmental Engineering School University of Science and Technology Beijing Beijing 100083 China *** 

出 版 物:《Journal of University of Science and Technology Beijing》 (北京科技大学学报(英文版))

年 卷 期:2002年第9卷第3期

页      面:166-169页

核心收录:

学科分类:081901[工学-采矿工程] 0819[工学-矿业工程] 08[工学] 

主  题:paste fill system reliability study complex system theory 

摘      要:Because of poor ground conditions, stoping methods of underhand headings withcemented fill were used in the Jinchuan No. 2 mine, a paste fill system was set up. In order toevaluate the reliability of the new system, investigations and trial running have been done. Morethan 20 items of modification or improvements related to paste preparation subsystem, pump and pipesubsystem, auto-controlling and monitoring subsystem were finished. The reliability of the pastefill system was analyzed by using the theory of large complex system, and it is useful inreliability study on paste fill system.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分