Reliability of paste fill system of the Jinchuan No.2 mine
Reliability of paste fill system of the Jinchuan No.2 mine作者机构:Civeil and Environmental Engineering School University of Science and Technology Beijing Beijing 100083 China ***
出 版 物:《Journal of University of Science and Technology Beijing》 (北京科技大学学报(英文版))
年 卷 期:2002年第9卷第3期
页 面:166-169页
核心收录:
学科分类:081901[工学-采矿工程] 0819[工学-矿业工程] 08[工学]
主 题:paste fill system reliability study complex system theory
摘 要:Because of poor ground conditions, stoping methods of underhand headings withcemented fill were used in the Jinchuan No. 2 mine, a paste fill system was set up. In order toevaluate the reliability of the new system, investigations and trial running have been done. Morethan 20 items of modification or improvements related to paste preparation subsystem, pump and pipesubsystem, auto-controlling and monitoring subsystem were finished. The reliability of the pastefill system was analyzed by using the theory of large complex system, and it is useful inreliability study on paste fill system.