Feasibility Study on Continuous Mining Method in Deep Position of Jinchuan Nickel Mine, China
Feasibility Study on Continuous Mining Method in Deep Position of Jinchuan Nickel Mine, China作者机构:Civil and Environ. Eng. School University of Science and Technology Beijing 100083 China
出 版 物:《Journal of University of Science and Technology Beijing》 (北京科技大学学报(英文版))
年 卷 期:2001年第8卷第2期
页 面:81-85页
核心收录:
学科分类:081901[工学-采矿工程] 0819[工学-矿业工程] 08[工学] 0806[工学-冶金工程] 0818[工学-地质资源与地质工程] 0815[工学-水利工程] 0805[工学-材料科学与工程(可授工学、理学学位)] 0813[工学-建筑学] 0703[理学-化学] 0802[工学-机械工程] 0814[工学-土木工程] 0801[工学-力学(可授工学、理学学位)] 0702[理学-物理学]
基 金:This work is a part of a joint program between Jinchuan nickel mine
主 题:Jinchuan nickel mine deep position continuous mining feasibility study
摘 要:Jinchuan nickel mine is the largest nickel mine in China. Cut-and-fill mining method with high density cementing materials is used in the mine. The original mining design divided the mining operation into two steps. The first step stopped the mining rooms and the second step stopped the pillars. Because the two-step method made big trouble for finally mining pillars and strongly limited the mining speed and production, it was successfully changed to a continuous cut-and-fill method without pillars. However, the mining operation in the mine has been down to 800 m and the mining condition is getting worse and more complicated. Through systematical field investigations and 3-D FEM analysis, it is proved that the mining method without pillars is feasible for mining deeper orebodies in Jinchuan nickel mine.