AN EXPERIMENTAL STUDY ON INCIPIENT CAVITATION EROSION OF FLOOD DISCHARGE TUNNEL WITH ORIFICE
AN EXPERIMENTAL STUDY ON INCIPIENT CAVITATION EROSION OF FLOOD DISCHARGE TUNNEL WITH ORIFICE出 版 物:《Journal of Hydrodynamics》 (水动力学研究与进展B辑(英文版))
年 卷 期:1992年第4卷第3期
页 面:59-66页
核心收录:
学科分类:080103[工学-流体力学] 08[工学] 080104[工学-工程力学] 081502[工学-水力学及河流动力学] 0815[工学-水利工程] 0801[工学-力学(可授工学、理学学位)]
主 题:cavitation erosion orifice bubble dynamics
摘 要:Serial grades of cement mortar specimens have been tested on the model of con- crete-lining flood discharge tunnel with orifice,The results show that incipient cavitation erosion number is much smaller than incipient cavitation *** on the principle of bubble dy- namics,the flow speed effect on incipient cavitation erosion number for cement mortar is pre- sented.