咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Research on Cost Overrun Risk ... 收藏

Research on Cost Overrun Risk of Construction Phase of Vietnam Highway International Contracting Project

Research on Cost Overrun Risk of Construction Phase of Vietnam Highway International Contracting Project

作     者:Hong Anh Vu Jianqiong Wang Lianxing Min Sy Hung Mai Hong Phong Nguyen Hong Anh Vu;Jianqiong Wang;Lianxing Min;Sy Hung Mai;Hong Phong Nguyen

作者机构:School of Economics and Management Southwest Jiaotong University Chengdu China School of Management Chengdu University of Traditional Chinese Medicine Chengdu China School of Railway Section University of Transport and Communications Hanoi Vietnam 

出 版 物:《Engineering(科研)》 (工程(英文)(1947-3931))

年 卷 期:2016年第8卷第3期

页      面:86-98页

学科分类:0202[经济学-应用经济学] 02[经济学] 020205[经济学-产业经济学] 

主  题:Highway Construction Cost Overrun Risk Management Vietnam 

摘      要:Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分