Foreword
Foreword出 版 物:《IMP & HIRFL Annual Report》 (中国科学院近代物理研究所和兰州重离子研究装置年报(英文版))
年 卷 期:2005年
页 面:10-11页
摘 要:In 2005, the commissioning totally 60 days for the CSR main ring was performed, the first-turn and stored C6+ beam (with lifetime more than 10 s) in the CSRm were achieved with≈7 MeV/u 12C4+ as the injection beam. Many technical progresses have been made before realizing the storage of ion beam, such as the control of magnet power supplies, the improve-