Thermal Power Generation Operating main steam pipings beyond their projected life
Thermal Power Generation Operating main steam pipings beyond their projected life出 版 物:《Electricity》 (电气(英文版))
年 卷 期:1990年第2期
页 面:24-26页
学科分类:080801[工学-电机与电器] 0808[工学-电气工程] 08[工学]
主 题:steam projected creep expenditure installation pipe planned beyond approaching safely
摘 要:*** the past decade,owing to the inces-santly increasino demand on electric en-ergy,the problem of prolongation of the servicelife of existing power stations approaching or-past their design life-term has attracted much at-tention and become a subject of common interestof the power industry in many *** industrially developed countries,the capi-tal investlnent of conventional power station isescalating rapidly,on the one hand,and on theother,a large number of thermal power generat-ing units have approached or exceeded theirdesigned *** such circumstancesone of the effective measures to meet the everincreasing demand on electrical energy is toextend the service life of existing power