文献详情 >Detection of schedule delay ri... 收藏

Detection of schedule delay risk of empirical construction projects

Detection of schedule delay risk of empirical construction projects

作     者:Tsegay GEBREHIWET Hanbin LUO 

作者机构:Department of Construction Management School of Civil Engineering and Mechanics Huazhong University of Science and Technology 

出 版 物:《Frontiers of Engineering Management》 (工程管理前沿(英文版))

年 卷 期:2018年第5卷第2期

页      面:251-267页

学科分类:1201[管理学-管理科学与工程(可授管理学、工学学位)] 08[工学] 082303[工学-交通运输规划与管理] 082302[工学-交通信息工程及控制] 0823[工学-交通运输工程] 

主  题:建设项目 进度延误风险 风险管理 交通系统 

摘      要:In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction ***, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision.