Simulation of clinker grinding circuits of cement plant based on process models calibrated using GA search method
Simulation of clinker grinding circuits of cement plant based on process models calibrated using GA search method作者机构:School of MiningCollege of EngineeringUniversity of Tehran Department of MiningFaculty of EngineeringUniversity of Kashan
出 版 物:《Journal of Central South University》 (中南大学学报(英文版))
年 卷 期:2014年第21卷第2期
页 面:799-810页
核心收录:
学科分类:080706[工学-化工过程机械] 08[工学] 0807[工学-动力工程及工程热物理]
主 题:cement plant clinker grinding genetic algorithm simulation optimization
摘 要:Particle size distributions of obtained samples from several sampling campaigns were determined and raw data were mass balanced before being used in simulation *** determination of breakage function,selection function,Bond work index,residence time distribution parameters,and Whiten s model parameters for air separators and diaphragms between the two compartments of tube ball mills,performance of the circuits was simulated for given throughputs and feed particle size *** s model parameters were determined by GA(genetic algorithm) toolbox of MATLAB *** on implemented models for modeling and simulation,optimization of circuits was carried *** increased nearly 10.5% and 15.8% in fresh feed capacity input to each tube ball *** addition,circulating load ratios of circuits are modified to 118% and 127% from low level of 57% and 22%,respectively,and also cut points of air separators are adjusted at 30 and 40 μm from high range of 53 and 97 μm,*** applications helped in well-operation and energy consumption reduction of equipments.