咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Rule-based scheduling of multi... 收藏

Rule-based scheduling of multi-stage multi-product batch plants with parallel units

Rule-based scheduling of multi-stage multi-product batch plants with parallel units

作     者:Bin Shi Xinrui Qian Shanshan Sun Liexiang Yan 

作者机构:Department of Chemical Engineering Wuhan University of Technology 

出 版 物:《Chinese Journal of Chemical Engineering》 (中国化学工程学报(英文版))

年 卷 期:2017年第25卷第8期

页      面:1022-1036页

核心收录:

学科分类:081702[工学-化学工艺] 08[工学] 0817[工学-化学工程与技术] 

基  金:Supported by the National Natural Science Foundation of China(21376185) 

主  题:Line up competition algorithm Order assignment role Multi stage multi product Parallel unit Scheduling optimization 

摘      要:A novel rule-based model for multi-stage multi-product scheduling problem(MMSP)in batch plants with parallel units is *** scheduling problem is decomposed into two sub-problems of order assignment and order ***,hierarchical scheduling strategy is presented for solving the former sub-problem,where the multi-stage multi-product batch process is divided into multiple sequentially connected single process stages,and then the production of orders are arranged in each single stage by using forward order assignment strategy and backward order assignment strategy respectively according to the feature of scheduling ***-up competition algorithm(LCA)is presented to find out optimal order sequence and order assignment rule,which can minimize total flow time or maximize total weighted process *** results show that the proposed approach can obtain better solutions than those of the literature for all scheduling problems with more than 10 ***,with the problem size increasing,the solutions obtained by the proposed approach are improved *** proposed approach has the potential to solve large size MMSP.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分