咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >SCOUR MITIGATION AT BRIDGE PIE... 收藏

SCOUR MITIGATION AT BRIDGE PIERS USING SACRIFICIAL PILES

SCOUR MITIGATION AT BRIDGE PIERS USING SACRIFICIAL PILES

作     者:M. Anisul HAQUE Md. Munsur RAHMAN G.M. Tarekul ISLAM M. Asad HUSSAIN 

作者机构:Prof.Institute of Water and Flood Management (IWFM) Bangladesh University of Engineering and Technology (BUET) Dhaka-1000 Bangladesh Assoc. Prof.Institute of Water and Flood Management (IWFM) Bangladesh University of Engineering and Technology (BUET) Dhaka-1000 Bangladesh LecturerInstitute of Water and Flood Management (IWFM) Bangladesh University of Engineering and Technology (BUET) Dhaka-1000 Bangladesh 

出 版 物:《International Journal of Sediment Research》 (国际泥沙研究(英文版))

年 卷 期:2007年第22卷第1期

页      面:49-59页

核心收录:

学科分类:081406[工学-桥梁与隧道工程] 08[工学] 0814[工学-土木工程] 082301[工学-道路与铁道工程] 0823[工学-交通运输工程] 

主  题:Scour mitigation Bridge pier Sacrificial pile Optimum arrangement 

摘      要:To mitigate scour around bridge piers, sacrificial piles are economic method where natural processes are involved. The arrangement should be such that scoured materials from the sacrificial piles should have enough volume to fill the scour hole created upstream of the pier in such a way that sediments are trapped inside the scour hole. This concept differs from earlier study made with sacrificial piles that mainly deals to reduce the strength of horseshoe vortex. To determine the effect of sacrificial piles for scour mitigation, alternative arrangements of piles were tested in front of a rectangular pier under clear-water condition and found that when the group of piles is placed at a distance of twice the projected width of the pier, for which percentage of blockage of the pier width is 60%, the scour volume can be reduced upto 61% while the maximum scour depth can be reduced upto 50%.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分