USEOFFULLFACESLURRYSHIELDFORPIPEJACKINGINHONGKONG'SRECLAIMEDLAND
USE OF FULL FACE SLURRY SHIELD FOR PIPE JACKING IN HONG KONG’S RECLAIMED LAND出 版 物:《岩石力学与工程学报》 (Chinese Journal of Rock Mechanics and Engineering)
年 卷 期:2003年第22卷第S1期
页 面:2438-2442页
核心收录:
学科分类:081406[工学-桥梁与隧道工程] 08[工学] 0814[工学-土木工程] 082301[工学-道路与铁道工程] 0823[工学-交通运输工程]
主 题:tunneling engineering full face slurry shield pipe jacking drainage construction reclainted land Hong Kong
摘 要:Pipe jacking has become a popular method in drainage construction in Hong ***,the variedground conditions encountered in reclaimed land may pose severe problems to pipe jacking *** paper presentsthe experience of using the full face slurry shield for pipe jacking in a reclaimed *** study shows that the full faceslurry shield with a rock cutting head performs *** ensure the machine can work effectively in all groundconditions,other factors need to be considered including the rock cutting head being worn away,the hitting of under-ground structures,the sustainability of jacked pipes alignment,the associated ground settlement and the damage to thejacked pipes caused by the jacking pressure.