文献详情 >USEOFFULLFACESLURRYSHIELDFORPI... 收藏

USEOFFULLFACESLURRYSHIELDFORPIPEJACKINGINHONGKONG'SRECLAIMEDLAND

USE OF FULL FACE SLURRY SHIELD FOR PIPE JACKING IN HONG KONG’S RECLAIMED LAND

作     者:Ying H M~1 Poon S W~2(1 The University of Greenwich,Greenwich,U.K.)(2 Department of Real Estate and Construction,The Universily of Hong Kong,Hong Kong,China) 

出 版 物:《岩石力学与工程学报》 (Chinese Journal of Rock Mechanics and Engineering)

年 卷 期:2003年第22卷第S1期

页      面:2438-2442页

核心收录:

学科分类:081406[工学-桥梁与隧道工程] 08[工学] 0814[工学-土木工程] 082301[工学-道路与铁道工程] 0823[工学-交通运输工程] 

主  题:tunneling engineering full face slurry shield pipe jacking drainage construction reclainted land Hong Kong 

摘      要:Pipe jacking has become a popular method in drainage construction in Hong ***,the variedground conditions encountered in reclaimed land may pose severe problems to pipe jacking *** paper presentsthe experience of using the full face slurry shield for pipe jacking in a reclaimed *** study shows that the full faceslurry shield with a rock cutting head performs *** ensure the machine can work effectively in all groundconditions,other factors need to be considered including the rock cutting head being worn away,the hitting of under-ground structures,the sustainability of jacked pipes alignment,the associated ground settlement and the damage to thejacked pipes caused by the jacking pressure.