Foreword
Foreword出 版 物:《IMP & HIRFL Annual Report》 (中国科学院近代物理研究所和兰州重离子研究装置年报(英文版))
年 卷 期:2006年
页 面:10-11页
摘 要:In 2006,the considerable progress of the commissioning of the HIRFL-CSR main ring was *** 7 MeV/u C6+beam was accumulated in 10 s to the ion number of≈10~9 by using stripping injection and electron cooling stacking,and accelerated to 1 GeV/u successful- *** relative momentum spreadΔP/P of 2×10-4was obtained after one second cooling, which is 4×10-3without cooling.