咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Optimizing Work Zones for Two-... 收藏

Optimizing Work Zones for Two-Lane Urban Road Maintenance Projects

Optimizing Work Zones for Two-Lane Urban Road Maintenance Projects

作     者:黄谦 石京 

作者机构:Institute of Transportation EngineeringDepartment of Civil EngineeringTsinghua University 

出 版 物:《Tsinghua Science and Technology》 (清华大学学报(自然科学版(英文版))

年 卷 期:2008年第13卷第5期

页      面:644-650页

核心收录:

学科分类:08[工学] 0814[工学-土木工程] 

主  题:maintenance work zone delay non-motor interference optimizing 

摘      要:Road maintenance work brings costs to the government and delays to users. The setting up of work zones often leads to severe congestion during peak hours, especially in busy urban areas. A road maintenance delay model is presented here that includes consideration of excessive traffic flow and non-motorists. Atrial-and-error method is used to find the optimal work zone length and the best work starting time to minimize the total cost of maintenance and delays. A numerical example with a sensitivity analysis is also given. The results show that optimal starting time is not sensitive to the flow speed and the increase of work zone speeds sharply reduces the total cost when the road is congested.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分