咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Study on Transmission Planning... 收藏

Study on Transmission Planning of Cascade Hydropower Stations along Lancang River Basin

Study on Transmission Planning of Cascade Hydropower Stations along Lancang River Basin

作     者:Cui Wenjia Du Zhongming Dai Jianfeng 

作者机构:China Power Engineering Consulting Group Corporation 

出 版 物:《Electricity》 (电气(英文版))

年 卷 期:2012年第23卷第1期

页      面:26-31页

学科分类:081504[工学-水利水电工程] 080802[工学-电力系统及其自动化] 0808[工学-电气工程] 08[工学] 0815[工学-水利工程] 

主  题:梯级水电站 澜沧江流域 输电规划 特高压直流输电 中国西南地区 传输方案 澜沧江上游 水电项目 

摘      要:Most of the hydropower projects in Southwest China and the adjacent foreign regions will be put into operation between 2015 and 2020, which will bring some difficulties for reasonable accommodation and delivery of electric energy. In this paper the author studies the development scale, development schedule, accommodation and transmission schemes of the cascade hydropower stations along the Lancang River basin, one of the five large basins in China, based on the load characteristics of grids at both the sending end and the receiving end, the strategy of complementary utilization of thermal power and hydropower, the advanced transmission technologies, and the optimal economic performance. The study results show that, the cascade hydropower stations on the upper reaches of the Lancang River in Yunnan should mainly serve Guangdong Province, with proper planning of partly serving Yunnan Province during dry seasons. The transmission schemes should adopt UHVDC, UHVAC, and single-tower double-circuited HVDC transmission scheme according to the transmission capacity and distance.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分