Theory and practice of construction simulation for high rockfill dam
Theory and practice of construction simulation for high rockfill dam作者机构:Department of Hydraulic and Hydroelectric EngineeringSchool of Civil EngineeringTianjin UniversityTianjin 300072China Department of Hydraulic and Hydroelectric EngineeringSchool of Civil EngineeringTianjin UniversityTianjin 300072China Department of Hydraulic and Hydroelectric EngineeringSchool of Civil EngineeringTianjin UniversityTianjin 300072China
出 版 物:《Science China(Technological Sciences)》 (中国科学(技术科学英文版))
年 卷 期:2007年第50卷第z1期
页 面:51-61页
核心收录:
基 金:Supported by the National Natural Science Foundation of China for Distinguished Young Scholars (Grant No. 50525927) the National Basic Research Program of China (973 Program) (Grant No. 2007CB714101)
主 题:high rockfill dam construction simulation cycle operation network visualization
摘 要:Construction simulation for high rockfill dam (CSHRD) is the technology that takes advantage of computer simulation to observe and analyze a complex construction process, which is useful for construction design and management. In this paper, the domestic and oversea research status of CSHRD is reviewed firstly, along with introduction of their present achievements and deficiencies, and the CSHRD theory is also described. Then, considering the influence of many stochastic factors, integrated simulation for high rockfill dam construction (HRDC) is presented with technologies of cycle operation network (CYCLONE) and computer simulation. It rationally combines two subsystems in HRDC, namely haulage and placement of rockfill subsystem, which reflects the actual construction objectively. Important parameters, such as the haulage intensity and traffic density, are obtained, and the process of CSHRD is represented intuitively in dynamic visualization. All of these help engineers to make rapid decisions in HRDC scientifically.