咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Status and Plan of the HL-2A P... 收藏

Status and Plan of the HL-2A Project

Status and Plan of the HL-2A Project

作     者:YAN Jiancheng ZHOU Caipin LIU Yong LIU Dequan the HL-2A Team 

出 版 物:《中国核科技报告》 (China Nuclear Science and Technology Report)

年 卷 期:2002年

页      面:865-873页

学科分类:08[工学] 082701[工学-核能科学与工程] 0827[工学-核科学与技术] 

主  题:HL-2A Project Installation 

摘      要:HL-2A is a new divertor tokamak under construction at Southwestern Institute of Physics (SWIP), Chengdu, China, based on the experience from HL-1[1] and HL-1M[2, 3]. HL is the short term of a Chinese word that means Toroidal Current Device. The main objectives of HL-2A are to produce more adaptable divertor configurations to study energy exhaust and impurity control (the first divertor

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分