Research on strategic risk identification method of equipment system development based on system dynamics
作者机构:College of Systems EngineeringNational University of Defense TechnologyChangsha 410073China
出 版 物:《Journal of Systems Engineering and Electronics》 (系统工程与电子技术(英文版))
年 卷 期:2023年第34卷第5期
页 面:1225-1234页
核心收录:
学科分类:11[军事学] 0711[理学-系统科学] 1106[军事学-军制学] 07[理学] 071101[理学-系统理论] 110602[军事学-军队管理学]
主 题:equipment system development strategy manage-ment strategic risk management risk identification system dynamics loop diagram of causality
摘 要:Strategic management of equipment system develop-ment must attach importance to effective strategic risk *** at the identification of strategic risk of equipment system development,firstly,the source of strategic risk of equip-ment system development is analyzed and *** on this,a causal loop diagram of strategic risk of equipment sys-tem development based on system dynamics is *** system dynamics analysis software Vensim PLE is used to carry out the risk influencing factors analysis,risk consequences ana-lysis,risk feedback loop identification and corresponding pre-control measures,and achieves a good risk identification effect.