Rule based vs Optimization based Workload Control with and without Exogenous Lead Times:An Assessment by Simulation
作者机构:School of ManagementJinan UniversityGuangzhou510632China GBA and B&R International Joint Research Center for Smart LogisticsJinan UniversityZhuhai519070China School of Intelligent Systems Science and EngineeringJinan UniversityZhuhai519070China Institute of Physical InternetJinan UniversityZhuhai519070China Factory Planning and IntralogisticsChemnitz University of TechnologyChemnitz09125Germany Department of Industrial and Systems EngineeringThe Hong Kong Polytechnic UniversityHong Kong999077China
出 版 物:《Journal of Systems Science and Systems Engineering》 (系统科学与系统工程学报(英文版))
年 卷 期:2023年第32卷第5期
页 面:553-570页
核心收录:
学科分类:0711[理学-系统科学] 07[理学] 08[工学] 070105[理学-运筹学与控制论] 081101[工学-控制理论与控制工程] 071101[理学-系统理论] 0811[工学-控制科学与工程] 0701[理学-数学]
基 金:supported by National Key Research and Development Program of China(2021YFB3301701) 2019 Guangdong Special Support Talent Program Innovation and Entrepreneurship Leading Team(China)(2019BT02S593) 2018 Guangzhou Leading Innovation Team Program(China)(201909010006) the Science and Technology Development Fund(Macao SAR)(0078/2021/A)
主 题:Workload control order release production planning production control make-to-order production
摘 要:Order release is a key production planning and control function,specifically in high variety contexts.A large literature on release methods that balance the workload consequently *** Workload Control methods can be rule based,using a simple greedy heuristic,optimization based or optimization based with lead times that are *** all three types of methods have the same objective,their performance has never been *** simulation,this study shows that a better on time delivery performance of jobs can be achieved by the two optimization based release *** importantly,optimization based methods that assume lead times to be exogenous significantly outperform alternative methods in terms of tardiness *** based and optimization based Workload Control without exogenous lead times overemphasize average lateness reduction,which leads to sequence deviations that offset performance improvements through *** contrast,Workload Control methods that assume lead times to be exogenous limit sequence deviations,which leads to a significant reduction in dispersion of *** has important implication for the future design of order release methods,and managerial practice.