咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Strength, deformability and pe... 收藏

Strength, deformability and permeability of kakiritic rocks from the Gotthard base tunnel

作     者:Martin Vogelhuber Erich Pimentel Georgios Anagnostou Martin Vogelhuber;Erich Pimentel;Georgios Anagnostou

作者机构:ETH ZurichZurichSwitzerland 

出 版 物:《Journal of Rock Mechanics and Geotechnical Engineering》 (岩石力学与岩土工程学报(英文版))

年 卷 期:2023年第15卷第9期

页      面:2224-2237页

核心收录:

学科分类:081406[工学-桥梁与隧道工程] 08[工学] 0814[工学-土木工程] 082301[工学-道路与铁道工程] 0823[工学-交通运输工程] 

主  题:Squeezing Pore pressure Triaxial testing 

摘      要:The 57-km long,new Gotthard Base Tunnel(GBT)crosses over a 1.1-km long stretch containing kakirites,*** rocks which,depending on the degree of tectonisation,may exhibit severe squeezing behaviour upon tunnel *** tunnel stretch was already identified as a key problem in the early planning phase,necessitating intensive geological exploration and laboratory investigations over a 14-year period,including research and development in experimental *** laboratory investigations for the GBT provided not only a considerable amount of data about the geotechnical parameters of the kakirites,but also valuable information about their basic behaviour and the adequacy of various testing techniques for this type of ***,by using specially designed testing equipment and procedures,it was shown that,(1)conventional rock mechanics triaxial tests cannot provide reliable results for kakirites;(2)the kakirites obey the principle of effective stress in Terzaghi’s classical form and consequently it is indispensable to measure the pore pressure during triaxial testing,analogously to the consolidated drained(CD)and consolidated undrained(CU)tests in soil mechanics;(3)the effects of a possible loss of water and desaturation during sampling,transport,storage and preparation of specimens can be successfully mitigated by subjecting the specimens to flow-through before the actual triaxial testing;and,(4)CD tests on partially saturated specimens that are obtained by means of flow-through can provide reliable and reproducible *** saves a significant amount of time,allows a greater number of tests to be performed,and allows results to be obtained more quickly,which is particularly important for decision-making during tunnel advance.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分