咨询与建议

看过本文的还看了

相关文献

该作者的其他文献

文献详情 >Assessing reservoir connectivi... 收藏

Assessing reservoir connectivity with pressure/rate surveillance data

作     者:G.F.J.Al-Khmaysawee Z.Reza C.S.Kabir 

作者机构:Missouri University of Sci.&Tech.RollaMOUSA University of OklahomaNormanOKUSA Incendium TechnologiesRound RockTXUSA 

出 版 物:《Petroleum Science》 (石油科学(英文版))

年 卷 期:2023年第20卷第2期

页      面:1077-1086页

核心收录:

学科分类:0820[工学-石油与天然气工程] 08[工学] 082002[工学-油气田开发工程] 

主  题:Reservoir compartmentalization Reciprocal-productivity index Total material-balance time Analysis of boundary-dominated flow period 

摘      要:Estimating reservoir connectivity is critical for assessing infill-drilling prospects and initiating fluid injection in enhanced oil recovery operations. Several methods have appeared in the literature over decades to meet these business needs, given that all tools, including seismic imaging, have limitations. Besides imaging, geochemical fingerprinting constitutes a powerful tool to gauge the compartmentalization question. However, real-time pressure/rate surveillance data allows assessing interwell connectivity vis-à-vis the overall drainage volume.This study presents a simplified approach to using the reciprocal-productivity index (RPI) vs. the total-material-balance time (tTMB) plot. This tool exhibits the same slope for those wells in the same compartment beyond the start of the boundary-dominated flow (BDF) period. The wells showing different slopes imply that they are in separate drainage volumes. The early-time transient period remains muted to minimize confusion on this Cartesian plot. We validated the proposed tool s efficacy with 2D and 3D models with increased degrees of reservoir complexity, followed by the verification phase with four field examples. The use of other analytical tools complemented our findings.

读者评论 与其他读者分享你的观点

用户名:未登录
我的评分