Multi-criteria decision making for nuclear power plant selection using fuzzy AHP:Evidence from Indonesia
作者机构:Electrical Engineering Study ProgramUniversitas Pendidikan IndonesiaBandungIndonesia Physics DepartmentAndalas UniversityPadangIndonesia Nuclear Science and Engineering Study ProgramBandung Institute of TechnologyIndonesia Research Center for Nuclear Reactor TechnologyNational Research and Innovation AgencyIndonesia Pusat Unggulan Ipteks Perguruan TinggiTechnical and Vocational Education and Training Research Center(TVET RC)Universitas Pendidikan IndonesiaIndonesia
出 版 物:《Energy and AI》 (能源与人工智能(英文))
年 卷 期:2023年第14卷第4期
页 面:99-111页
核心收录:
学科分类:080802[工学-电力系统及其自动化] 0808[工学-电气工程] 08[工学]
基 金:Universitas Pendidikan Indonesia UPI (1163/UN40-LP/PT.01.03/2022)
主 题:Analytical hierarchy process Fuzzy AHP Multi-criteria decision making Nuclear power plant
摘 要:In terms of planning aspect,nuclear power plant(NPP)development needs analyses,consideration,and right decision making due to multi criteria *** study prioritizes the best site development of Indonesian NPPs in terms of 21 social,economic,and technical perspectives which comprise transmission network,oper-ating cost,economic impact,geology,geotechnic,seismology,population density,environment,cooling water,meteorology,hydrology,proximity to hazardous facilities,topography,land use,proximity to wetland,evacu-ation route,security,transportation network,legal consideration,impact of tourism,land ownership,historical places,and public acceptance,all identified to be considerations for the best *** Fuzzy algorithms(Chang’s Extent Analysis and Buckley’s Fuzzy AHP)were used to determine the criteria priorities as well as NPP site feasibility of two locations in *** results found that geology,geotechnic,and seismology(SA1);security(SO1),population density(SA2),environment(SA3),and cooling water(SA4)had the highest priorities among the 21 *** on the 5 top priority criteria,West Kalimantan and East Kalimantan provinces serve as the best candidates for the NPP *** an innovative and novel multi criteria Fuzzy AHP–based decision making(MCDM)approach has been proven to become a useful reference to select NPP sites in Indonesia.