Realization of T_(e0)>10 keV long pulse operation over 100 s on EAST
Realization of Te0>10 keV long pulse operation over 100 s on EAST作者机构:Institute of Plasma PhysicsChinese Academy of SciencesHefei 230031People's Republic of China General AtomicsSan Diego 92186-5608United States of America CEAInstitute for Magnetic Fusion Research(IRFM)Saint-Paul-lez-Durance F-13108France
出 版 物:《Plasma Science and Technology》 (等离子体科学和技术(英文版))
年 卷 期:2023年第25卷第2期
页 面:6-10页
核心收录:
学科分类:08[工学] 082701[工学-核能科学与工程] 0827[工学-核科学与技术]
基 金:the National Key R&D Program of China(No.2022YFE03010003) National Natural Science Foundation of China(No.12275309)
主 题:EAST tokamak high T_(e) integrated operation scenario
摘 要:In 2021,EAST realized a steady-state long pulse with a duration over 100 s and a core electron temperature over 10 *** is an integrated operation that resolves several key issues,including active control of wall conditioning,long-lasting fully noninductive current and divertor heat/particle *** fully noninductive current is driven by pure radio frequency(RF)waves with a lower hybrid current drive power of 2.5 MW and electron cyclotron resonance heating of 1.4 *** is an excellent experimental platform on the timescale of hundreds of seconds for studying multiscale instabilities,electron-dominant transport and particle recycling(plasma-wall interactions)under weak collisionality.