A hybrid circuit breaker with fault current limiter circuit in a VSC-HVDC application

作     者:Muhammad Ahmad Chunyang Gong Muhammad Haroon Nadeem Hui Chen Zhixin Wang 

作者机构:School of Electronics Information and Electrical EngineeringShanghai Jiao Tong UniversityShanghai 200240People’s Republic of China Shanghai University of Electric PowerShanghai 200090People’s Republic of China EnergyVille/Electa Research GroupElectrical Engineering Department ESATKU Leuven3001 HeverleeBelgium. 

出 版 物:《Protection and Control of Modern Power Systems》 (现代电力系统保护与控制(英文))

年 卷 期:2022年第7卷第1期

页      面:657-669页

核心收录:

学科分类:0808[工学-电气工程] 080802[工学-电力系统及其自动化] 08[工学] 0837[工学-安全科学与工程] 

基  金:supported express by The National Key R&D Program of China (2018YFB1503000,2018YFB1503001) The Shanghai Science and Technology Commission Program (20dz1206100) 

主  题:VSC-HVDC HCB FCLC Short circuit fault MOA 

摘      要:A conventional hybrid circuit breaker(HCB)is used to protect a voltage source converter-based high voltage direct current transmission system(VSC-HVDC)from a short circuit *** the increased converter capacity,the DC protection equipment also requires a regular *** paper adopts a novel type of HCB with a fault current limiter circuit(FCLC),and focuses on the responses of voltage and current during DC faults,which are associated with parameter ***/EMTDC based simulation of a three-terminal VSC-HVDC system confirms the effectiveness and value of HCB with FCLC,by using an equivalent circuit modelling *** experimental tests validate the simulation *** peak fault current is reduced according to the current limiting inductor(CLI)increase,and can be isolated more *** adopting parallel metal oxide arrester(MOA)with the main branch of HCB,voltage stresses across the breaker components decrease during transient and continuous operation,and less energy needs to be dissipated by the *** remnant current for all cases is transmitted to power dissipating resis-tor(PDR)in the final stage,and the fault current is reduced to the lowest possible *** the current from the main branch is transferred to the FCLC branch,transient voltage spikes occur,while smaller PDR is required to absorb current in the final stage.